Wörtherseestadion
Woertherseestadion is establisched between Klagenfurt and the Woerthersee in a wonderful landscape of mountain ranges and green hills. After 20 months of construction time the soccer stadium was completed punctually for the European Football Championship 2008.
To ensure an efficient and environmentally friendly use of energy, all light and ventilation systems were equipped with modern building control systems of DEOS AG.
Two OPEN 3000 EMS controller monitor and control over 928 physical data points, six ventilation systems and a range of air-conditioning units. The OPEN EMS installation also manages the complete and interactive arrangement for lighting and shutters for the whole arena. For this, every mains distributor point thoughout the large complex is monitored for faults, and this includes phase monitoring and assessment of fault current relays. Emergency power generation is also integrated into the comprehensive facility management system considering mains failures as well as peak-load reaction throughout the installation. Prerequisite therefore is the determination of the consumption data which will be acquire for the building control system via controller or PC.